Posts Tagged ‘Quality System’

No, I don’t mean running around the office shouting your head off about who’s done what wrong!

canstockphoto17671331

This is all about making sure that you classify your corrective actions into one of three groups to aid subsequent analysis. Now, I should add before going any further, that this is my bespoke way of dealing with this issue but I find it really effective. Here is the first category:

SD – System Disregarded

A minor CAR here as the procedure is fine and current but, for whatever reason, staff occasionally decide not to follow bits of it (as opposed to blatantly ignoring everything). Perhaps they are not signing off all the boxes; stamping a document or filling in some information. You need to do a really good root cause analysis to find out why of course.

SI – System Inadequate

Another minor CAR and the most common as it refers to the system being out of step with what is actually happening in the office or on the shop floor. Invariably it is when you see the procedures not outlining what exactly happens out there. In one sense it is a good thing because it shows the processes are being developed – it’s just that someone forgot to tell the Quality Manager to amend the procedure! What do you mean that never happens where you work!

SN – System Needed

This is the worst case and a major CAR because there just isn’t system that you can evidence. For example there is no audit schedule so nothing else can follow without that; there is no contract review of sales orders against customer purchase orders or no management reviews take place etc etc.

Well, I hope you like the sound of that and can see the benefit. By all means tell me how you dress this aspect of your system by commenting below and remember that more useful support can be found at http://www.iso9001supportcentre.com.

ps: Some exciting news coming soon on the 9001:2015 training video front soon.

 

 

 

 

Peter&Helen WB smallIt can take a while to get a case study completed  – but isn’t it worth it! Read on . . .

Turner Hire & Sales Ltd have been established in South Yorkshire since 1972 hiring and selling industrial plant from their branches at Rotherham, Wath, Worksop and Sheffield. The company decided they needed to give their customers a clear signal of their desire and determination to provide an even better quality product and service. This led them to look at the international quality management standard ISO 9001 and search for a local consultant.

In doing so Managing Director Mick Holmes came across another Rotherham based Chamber member, Pete Thornton-Smith of the 9001 Support Centre at Thornbank on Moorgate, at a Quality Conference in Sheffield back in 2014. They soon struck up a good understanding of the work required and how to ‘make it happen’.

Mick makes the point, “I always feel much more comfortable working with local experts and found that whoever I asked, one name kept getting recommended, so Pete was subsequently engaged to work with Quality Manager Helen Hollingworth and began working with Turner Hire late 2014 and we are delighted with the outcome”.

“Pete demonstrated a vast amount of knowledge as regards the standard but more importantly, how to work with us to ensure that we installed an effective system that everyone understood. A jargon free area if you will. In addition, we threw him a few curve balls it has to be said, but he calmly dealt with them and returned them with interest”.

Mick goes on to say “The certification of compliance with ISO 9001:2008 recognises that the policies, practices and procedures of our firm ensure consistent quality in the product and service that we provide to our customers. With this certification, our customers can be confident that Turner Hire & Sales Ltd is dedicated to maintaining the highest efficiency and responsiveness in achieving our ultimate goal – guaranteed customer satisfaction”.

“Achieving the certification was a smooth and natural progression for the company, because it essentially formalised the structures, standards and processes we already had in place. Having gained certification for all our sites at the end of 2015 with ISOQAR, we are in a much stronger position commercially and have been delighted to see the benefits that Pete talked about early on in the project”. Peter and Helen are pictured with the certificate.

It goes without saying we would recommend Chamber members to collaborate together as much as they can and if you need 9001 (and 14001 or 18001 for that matter as we do) then Pete’s your man. He really does ‘Lighten the Load’.

You can contact turner Hire and Sales on 01709 828444, www.turnerhire.com or email them on enquiries@turnerhire.com

As always Pete can be contacted at the ISO 9001 Support Centre on 01709 301303 or via his website www.iso9001supportcentre.com or email at  pete@iso9001supportcentre.com

 

canstockphoto23069450
Let’s be honest, nobody likes to receive a Corrective Action Report. Whoever is on the receiving end more than likely takes it personally and probably finds every reason under the sun to get out of taking responsibility for it and taking action to sort it. So, begins another day in the life of a QA man.

I see this all too often so hit on the option that is so simple if you are really facing this where ever you work – just give the form a different name!

We are all told when we undergo our auditor training that wonderful acronym of – Audits Uncover Defects In The System – so we should promote that on this occasion. Why not try a System Deficiency Note which trips off the tongue nicely as an SDN? In addition you could consider using System Enhancement Note for the PARs – but you’ll have to be quick to get any mileage out of that I guess 🙂 If you haven’t heard it is removed in the 2015 version, although I still think it can serve a purpose when recording action to mitigate ‘risk’.

I am sure many of you have already come to the same conclusion so share how you have retitled your CARs. Remember you can get more support in the form of training, the free App, virtual mentoring and videos by clicking through to the 9001 Support Centre.

ps: You can of course use the idea in any management system, not just quality.

 

 

 

 

.

会議When it comes to authorising and approving procedures do you just type them and bang them out or do you print them and see to it that they get physically signed off?

It really surprises me how many systems I see like the first. There is no evidence of you having taken responsibility for either of these requirements. No names, departments, nothing.  When I query this I tend to get told well “I’m the only one who writes them”; “I show them the relevant manager first” or “We can’t wait that long to get them issued”. However, without some accountabilty how do you address the requirement to authorise and approve documentation on issue or amendment?

Now, sometimes I see the authors name typed in and perhaps with a date in the footer of the document which is better than nothing.  Strictly speaking though you would have to evidence that the ‘author’ is the only person with access to the system to create and amend documents which is a bit of a faff. However, you still can’t evidence that the process owner has had any input into what is strictly his or her domain.

Far better to include two signatories with the process owner (often the Head of Department)  authorising it and the QA person approving it.  That way the process owner takes responsibility for releasing information as to what happens on his or her patch. Without that, and I have seen this, you get the response “Well I wasn’t asked about it or shown it before it was issued”. The QA person should approve it so as to run the rule over it for adequate contact and auditability.

Now in this day and age you can obviously have, provided again that suitable control exists, electronic signatures to save the physical  printing. Would be interested to know what you do so please share your experiences. More helpful support at the 9001 Support Centre.

 

 

 

 

ShredderIf you already have a system in place you are doubtless pondering as you look towards the 2015 version whether to bang not only the manual but the mandatory six through the jaws of your shredder as well. (Yes, I know Preventive Action goes anyway but let’s run with it yeah)

The likelihood as I see it, having talked to my sites, is that they will be retained and the temptation to run amok resisted. It’s a bit like some of us now being allowed to get our hands our pension pot to do with as with please isn’t it. You so want to but you hold back.

The manual if written properly (i.e. in say 8 – 10 pages max) is a good marketing tool and the procedures are useful support for those getting there heads round the requirements in QA. However, what to do if you are installing your system?

I think that really depends on the skills and knowledge of the team (yeah, no management representative either doing all the work) who will look after these processes. In my opinion, if they know them inside out then there would appear to be no need to burden them with procedures provided adequate records are being retained to evidence control of each process. However, if they are lacking experience, there is no doubt that there is a good case for writing them. As with all parts of the standard – if not having a procedure risks the process falling over, then you need one.

I have to get my head round how to upgrade the 9001 Training Guides to accommodate the extra requirements and the general move-around of existing procedures so by all means let me know what you would like to see and in what format.  The current version for 2008 are here if you’ve never seen them and would like help with that version.

 

 

 

First off, I need to say a quick ‘welcome’ to the new members of this group.  Many thanks for coming on board after seeing the blog. This is where we kick around some fresh ideas about 9001.

Now this time, instead of telling a story in the usual format, I have decided to throw a case study into the mix.  Let’s see how well you respond to the challenge of actually putting your knowledge into practice.  It’s just a bit of fun but, in all seriousness, I am sure you like me want to keep your skills honed and there is no better way in my opinion.

Bear in mind these two questions and leave your replies in the box at the bottom:

a. Would you raise a CAR based on what you know already and if so what would it be and which paragraph would you raise it against.

b. Are there any other areas where you are thinking there is a possible CAR but would seek out more evidence before making a decision?

CASE STUDY STARTS

The company is a single site and fabricates cabinets out of metal sheet by using a computerised laser cutting machine; a forming press; general machining and TIG and MIG welding.

You discuss the control of documents with the QA Representative and start by asking to see the Index and Change Control system. You are handed the Quality Manual and told that the index is at the back in an appendix. You verify a list of procedures only but note that there is no revision number included, only the title. When you query this you are told “Well if we added that then every time we amend a procedure then we would have to amend the manual which would be a real bind”.

When you ask if there is any other document containing this information then you are told “No, we’ve always done it that way”. You ask to see a copy of the relevant procedure for Document Control but are told they have never been told they need one which is when you spot it is not on the list.

You enquire as to how the procedures are authorised and reviewed before issue and how the company then communicates with staff that amendments have been made. You are shown that each procedure has the author’s name typed into the footer of each procedure with the date of issue and that staff aren’t told of amendments.

New or amended procedures are filed in the main binder with a copy in each of the 4 departmental binders (Sales and Purchasing office, Drawing office, Warehouse and shop floor) and the old version shredded.

CASE STUDY ENDS

I look forward to hearing your opinions and I will send an Amazon voucher as a thank you to whoever I feel puts together the best case.  Make your Quality stand out!

BarryNot surprisingly, this is a very common question from companies during my time on site whilst I am creating the QMS.

First, let us assume the the company has someone who they are putting forward as the QA Representative – not always the case I know.  Also let us work on the basis that this person (you?) has another job, a main job, around which they have to find the time to look after the system. Now, there is a 4 – 6 month period ahead of you that involves a stage 1 audit before ending with the stage 2 audit.

To cope in this second phase when the system has been launched and staff start to work in accordance with it, I always suggest a day a week is required.   This is based on the fact that there will be invariably be at least 2 audits a month to do because the 12 month schedule has to covered in half the time.  On the first traunch of audits there will be CARs raised so they all have be be communicated, actioned – and chased?. There is all that data to locate and analyse on a regular basis; perhaps the approved suppliers list to amend because new suppliers are being sourced and then that Management Review meeting to fit in – and aren’t the majority of the actions going to be for you!

On top of that you have to make sure you know your way around the system, whether it is hard copies or an intranet or both, so you can speak about it with confidence when the auditor is on site. Don’t forget that procedures will need amending and perhaps forms as well so the whole change control process needs time allocating to it.

Mmm, quite a bit to do. It is important that the company and the staff see this commitment on a regular basis as you endeavour to make it all part of the company culture. I find a day a week to be a good test of that Management commitment, but I feel it is a fair and realistic allowance. What’s your experience?

If all that sounds a daunting prospect don’t forget help is at hand in the form of site visits, mentoring over the web and auditor training at the 9001 Support Centre.

ps: Next time I’ll move onto the commitment after the stage 2 when it’s all died down a bit – or has it?